Southworth Main Level & Kitchen Remodel

We started the Southworth kitchen in April 1st and finished in June 20th. The design included: white cabinets with recessed panels, white Cambria quartz countertop, subway tiled backsplash, pendant lights, Kraus sink, Moen faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet, smart undercabinet lights, smart ceiling mounted lights, smart outside light, soft close dovetail drawers, soft close doors,

rykushner@verizon.net

Rosa Main Level & Kitchen Remodel

We started the Rosa kitchen in 2007 and finished in 2 months. The design included: cherry cabinets with recessed panels, Uba Tuba granite countertop, slate tiled backsplash, pendant lights, kohler composite sinks, Kohler faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet, smart undercabinet lights, smart ceiling mounted lights, smart outside light, soft close dovetail drawers, soft close doors

Catherine.McDaniel@wswa.org

Pitcher Master Bathroom Suite

We started the Pitcher Master Bathroom in 2022 and finished in 6 weeks. The design included: black cabinets w/recessed panels, white quartz countertop, white tiled backsplash, wall sconce lights, white ceramic sink, black Kohler faucet, soft close drawers, soft close doors. Gray tiled floor, white carrara marble wall tiles, hexagon shower floor tiles, black finished shower fixtures, custom glass shower door, custom teal tile in shower niche. custom waterproof strip light in shower niche.

khalilmona@hotmail.com

Negron Whole House & Kitchen Remodel

We started the Negron kitchen in 2015 and finished in 2 months. The design included: white painted cabinets with recessed panels, granite countertop, subway tiled backsplash, pendant lights, Kraus sink, Moen faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet, smart undercabinet lights, smart ceiling mounted lights, smart outside light, soft close dovetail drawers, soft close doors,

kneedlerkl@gmail.com

Nagy Whole House & Kitchen Remodel

We started the Nagy kitchen in 2012 and finished in 2 months. The design included: cinnamon cabinets with recessed panels, VA Soapstone countertop, subway tiled backsplash, pendant lights, kohler composite sinks, Kohler faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet, smart undercabinet lights, smart ceiling mounted lights, smart outside light, soft close dovetail drawers, soft close doors

pam21087@aol.com

Moon Master Bathroom

We started the Moon Master Bathroom and finished in 4 weeks. The design included: black cabinets w/recessed panels, white quartz countertop, white tiled backsplash, wall sconce lights, white ceramic sink, black Kohler faucet, soft close drawers, soft close doors. Gray tiled floor, white carrara marble wall tiles, hexagon shower floor tiles, black finished shower fixtures, custom glass shower door, custom teal tile in shower niche. custom waterproof strip light in shower niche.

jose.negron@avantitech.net

Marcus Master Bathroom

We started the Marcus Master Bathroom and finished in 4 weeks. The design included: black cabinets w/recessed panels, white quartz countertop, white tiled backsplash, wall sconce lights, white ceramic sink, black Kohler faucet, soft close drawers, soft close doors. Gray tiled floor, white carrara marble wall tiles, hexagon shower floor tiles, black finished shower fixtures, custom glass shower door, custom teal tile in shower niche. custom waterproof strip light in shower niche.

psweeney2005@yahoo.com

Lowell (Father's) Kitchen Remodel

1970's retro kitchen brought into the modern day kitchen with all the luxuries. Including a travertine tile floor. We started the Lowell kitchen in 2009 and finished in 2 months. The design included:  natural cherry cabinets with recessed panels, black granite countertop, no tiled backsplash, pendant lights, kohler composite sinks, Kohler faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet.

Laufer Master Bathroom

We started the Laufer Master Bathroom in 2022 and finished in 6 weeks. The design included: black cabinets w/recessed panels, white quartz countertop, white tiled backsplash, wall sconce lights, white ceramic sink, black Kohler faucet, soft close drawers, soft close doors. Gray tiled floor, white carrara marble wall tiles, hexagon shower floor tiles, black finished shower fixtures, custom glass shower door, custom teal tile in shower niche. custom waterproof strip light in shower niche.

pritilanger14@gmail.com

Joffre Kitchen Remodel

We started the Joffre kitchen in 2013 and finished in 2 months. The design included: espresso painted cabinets w/recessed panels, white quartz countertop, subway tiled backsplash, pendant lights, kohler composite sinks, Kohler faucet, GE Cafe smart appliances, butlers pantry display area, beverage/wine cooler, Pantry closet with heavy duty shelving, smart lights in closet, smart undercabinet lights, smart ceiling mounted lights, smart outside light, soft close dovetail drawers, soft close doors